Concrete Floor Epoxy in Irving, TX
Multi-layer epoxy and urethane flooring systems.

Technical
Specifications.
Commercial Painting Contractors Irving delivers advanced epoxy floor coating systems engineered to protect and enhance concrete surfaces in demanding commercial and industrial environments throughout the greater Irving area. Our floor coating specialists bring deep technical expertise in multi-layer epoxy and urethane systems designed to resist chemical exposure, abrasion from forklift and vehicular traffic, thermal stress, moisture intrusion, and the punishing conditions common to manufacturing facilities, warehouses, automotive shops, commercial kitchens, and high-traffic public spaces. We understand that concrete floor protection is critical infrastructure—protecting structural investments while providing easy-to-clean surfaces that enhance facility operations, worker safety, and aesthetic appeal. Serving Irving's industrial corridors, retail developments, automotive facilities, and food processing operations, we've installed hundreds of thousands of square feet of high-performance floor systems that deliver lasting protection and measurable operational benefits.
Multi-layer epoxy and urethane floor systems
Chemical-resistant coatings for processing areas
Decorative quartz broadcast and flake systems
Anti-slip safety textures and additives
Seamless hygienic surfaces for food facilities
UV-stable systems for outdoor applications
Fast-cure formulations minimizing downtime
Complete crack repair and substrate preparation
Irving
Context.
Operating from our Irving base, we serve the concentrated industrial and commercial activity throughout Irving's manufacturing districts, the automotive corridor along Irving Boulevard, and the expanding retail and food service sectors that characterize North Texas's diverse economy. Our teams understand the floor coating requirements across Irving's facility spectrum—from lightweight decorative systems for retail showrooms to heavy-duty industrial coatings protecting manufacturing floors subjected to aggressive chemicals and constant forklift traffic. We navigate the scheduling complexities of 24/7 operations, coordinate with facility engineers familiar with North Texas construction methods, and deliver floor systems that meet the demanding performance standards expected in Irving's competitive commercial market.
Specify Your Project
Strategic
Advantages.
Extended concrete lifespan through superior moisture barrier and abrasion protection
Enhanced safety via seamless surfaces eliminating trip hazards and optional slip-resistance
Improved operational efficiency through easy-to-clean surfaces reducing maintenance labor
Chemical resistance protecting concrete from exposure to oils, acids, and process materials
Aesthetic enhancement creating professional appearance that reinforces quality standards
Rapid installation minimizing facility downtime and lost productivity
Long-term cost savings compared to repetitive repair of unprotected concrete
Our Proven
Process.
Comprehensive concrete assessment evaluating substrate condition, moisture, and service requirements
Mechanical surface preparation including grinding or shot blasting to proper concrete profile
Crack and damage repair using compatible epoxy or urethane patching compounds
Moisture mitigation if testing reveals vapor transmission requiring barrier systems
Application of epoxy primer ensuring optimal adhesion to prepared substrate
Build coat application achieving specified thickness with optional decorative broadcast
Urethane or epoxy topcoat providing durable, chemical-resistant wearing surface
Frequently Asked
Questions.
How long before we can use the floor after epoxy application?
Standard epoxy systems typically cure sufficiently for light foot traffic in 24-48 hours and full service including forklift traffic in 5-7 days. However, we offer fast-cure formulations allowing foot traffic in 4-8 hours and vehicle traffic in 24 hours for facilities requiring minimal downtime. Cure times vary based on temperature, humidity, and specific product selection—we recommend systems optimized for your operational requirements and climate conditions.
What's the difference between epoxy and urethane floor coatings?
Epoxy provides exceptional adhesion, chemical resistance, and builds thickness efficiently—ideal for base and build coats. Urethane topcoats offer superior UV stability preventing yellowing in sunlight exposure, better abrasion resistance for forklift traffic, enhanced flexibility accommodating thermal expansion, and superior resistance to de-icing salts and chemicals. Most high-performance systems combine epoxy primers and build coats with urethane topcoats, optimizing each material's strengths for maximum longevity.
Can epoxy coatings be applied to old or damaged concrete?
Yes, with proper preparation. We evaluate existing concrete for structural integrity, moisture issues, contamination, and surface damage. Repairs are performed using appropriate patching materials. Weak or contaminated surface layers are removed mechanically. Moisture barriers are installed if vapor transmission testing indicates issues. However, severely deteriorated concrete with deep spalling, structural cracks, or chronic moisture problems may require concrete replacement before coating application—we provide honest assessments and cost-effective recommendations.
How do you create slip-resistant epoxy floors?
We offer multiple slip-resistance options: fine aggregate broadcast into the final coat creating subtle texture, larger grit materials for heavy-duty traction, aluminum oxide additives providing excellent slip resistance while maintaining cleanability, and textured topcoats using specialized formulations. The appropriate approach depends on your facility's safety requirements, cleaning protocols, and foot traffic patterns. We can achieve specific Coefficient of Friction (COF) values required by insurance or regulatory standards.
What causes epoxy floor coatings to fail prematurely?
Common failure modes include inadequate surface preparation leaving contaminants that prevent adhesion, moisture vapor transmission through concrete exceeding coating's tolerance, improper product selection for service conditions, application during unfavorable temperature or humidity conditions, insufficient coating thickness for traffic demands, and lack of proper primers for challenging substrates. Our thorough preparation protocols and product selection process prevents these failures, delivering systems that achieve expected 10-20 year service life.
Can you match specific colors or add decorative elements?
Absolutely. We offer unlimited custom colors, metallic epoxy systems creating unique aesthetics, quartz broadcast systems providing decorative patterns and textures, vinyl flake systems available in numerous color combinations, logo and line integration for branding or safety marking, and clear coats over stained or dyed concrete. We provide samples and can create digital renderings showing proposed floor design before application.
How do I maintain epoxy floors after installation?
Epoxy floors are remarkably low-maintenance. Regular cleaning involves dry dust mopping or sweeping to remove abrasive dirt, damp mopping with neutral pH cleaners (avoiding harsh chemicals or acidic solutions), and periodic deep cleaning using auto-scrubbers for large areas. Avoid steel wool or abrasive pads that can scratch topcoats. We provide detailed maintenance protocols specific to your coating system and can recommend commercial cleaning products compatible with your floor installation.
Project Lifecycle
Typical deployment timeline for Irving facilities.
Evaluation
Day 1-2Substrate analysis and detailed specification development.
Mobilization
Day 3-5Site protection, equipment setup, and material procurement.
Execution
VariesMulti-layered coating application with phased deployment.
Validation
Final DayQuality audit, walk-through, and site demobilization.
Evaluate
Your Asset.
Whether you possess a single corporate unit or an entire industrial complex, our professional team is prepared to develop your project specifications.